AB-500 Series

All forms have been updated to be fillable PDFs. If you encounter any issues with these files, please email document control: documentcontrol@absa.ca

Note: The Public Consultation Link shall be made available for a six-month period commencing on Sept. 1 of the year prior to the next scheduled reaffirmation year.

Design Registration (AB-500 Series)
Form. No. Document Name Current Edition No. Current Revision No. Current Publication Date Next Scheduled Reaffirmation Responsible Position Enabling Information Bulletin Public
Consultation
Link
Public
Consultation
Disposition
Link
AB-520 Finite Element Analysis (FEA) Requirements Regarding the Use of FEA to Support a Pressure Equipment Design Submission 2 0 2023-10-26 2028 Design Survey Manager IB23-046 Sep 1, 2027Jun 1, 2028
AB-521 Engineered Pressure Enclosures 3 0 2024-10-10 2029 Design Survey Manager IB24-008 Sep 1, 2028Jun 1, 2029
AB-521a RRIMR Quality Plan Self-Evaluation and Application Form 0 0 2024-10-10 2029 Design Survey Manager N/A Sep 1, 2028Jun 1, 2029
AB-525 Overpressure Protection Requirements for Pressure Vessel and Pressure Piping 3 0 2025-10-17 2030 Design Survey Manager IB25-017 Sep 1, 2029Jun 1, 2030
AB-530 Quality Plan Requirements for Pressure Vessel Design Submissions 2 0 2024-10-10 2029 Design Survey Manager IB24-007 Sep 1, 2028Jun 1, 2029
AB-531 Quality Plan Requirements for AB-OU Pressure Piping Design Submissions 2 0 2024-10-10 2029 Design Survey Manager IB24-007 Sep 1, 2028Jun 1, 2029
AB-535 Requirements for Alteration Design Registration based on Fitness for Service Assessments 3 0 2026-10-02 2031 Design Survey Manager IB26-006 --
AB-536 Requirements for the Integrity Management of Grade 91 Steel Used Above Currently-Permitted Allowable Stresses 2 0 2022-04-28 2027 Assistant Chief Inspector, Technical Administration IB22-005 Sep 1, 2026Jun 1, 2027
AB-539 Engineered Composite Systems for Pressure Equipment Alterations 2 0 2024-10-10 2029 Design Survey Manager IB24-009 Sep 1, 2028Jun 1, 2029
Pressure Equipment Forms - 2. Construction and Installation (AB-500 Series)
Form. No. Document Name Current Edition No. Current Revision No. Current Publication Date Next Scheduled Reaffirmation Responsible Position Enabling Information Bulletin Public
Consultation
Link
Public
Consultation
Disposition
Link
AB-511 The Impact Testing Enigma 4 0 2026-06-23 2031 Manager of Inspections N/A --
AB-518 Pressure Piping Construction Requirements Document 9 0 2022-09-19 2027 Manager of Inspections IB22-014 Sep 1, 2026Jun 1, 2027
AB-518a AB518a replaced by AB-029b
AB-518b Pressure Piping QMS Written Description Verification Checklist 0 0 2026-07-17 2031 Manager of Inspections N/A Sep 1, 2026Jun 1, 2027
AB-524 Pressure Relief Devices Requirements Document 8 0 2026-07-09 2031 Manager of Inspections IB26-001 --
AB-524b PRD QMS Written Description Certification Checklist 0 0 2026-06-23 2031 Manager of Inspections N/A --
AB-537 Thermal Liquid Heating System Requirements 2 0 2023-05-05 2028 Manager of Inspections IB23-019 Sep 1, 2027Jun 1, 2028
AB-540 Quality Management System Requirements for Welder Performance Qualification Testing 1 2 2026-07-13 2027 Manager of Inspections IB26-005 Sep 1, 2026Jun 1, 2027
AB-540a WPQ Testing Scope and Responsibilities 1 0 2026-08-07 2027 Manager of Inspections N/A Sep 1, 2026Jun 1, 2027
AB-540b Welder Performance Qualification Testing Requirements QMS Manual Checklist 0 0 2026-06-23 2027 Manager of Inspections N/A Sep 1, 2026Jun 1, 2027
AB-541 Quality Management System Requirements for Pressure Fitting Construction 1 2 2026-07-13 2027 Manager of Inspections IB26-003 Sep 1, 2026Jun 1, 2027
AB-541a Pressure Fitting Construction Requirements QMS Manual & Audit Checklist 0 0 2026-06-23 2027 Manager of Inspections N/A Sep 1, 2026Jun 1, 2027
AB-541b Pressure Fitting Construction Requirements QMS Manual & Audit Checklist 0 0 2026-06-23 2027 Manager of Inspections N/A Sep 1, 2026Jun 1, 2027
Pressure Equipment Forms - 3. Repair and Alteration (AB-500 Series)
Form. No. Document Name Current Edition No. Current Revision No. Current Publication Date Next Scheduled Reaffirmation Responsible Position Enabling Information Bulletin Public
Consultation
Link
Public
Consultation
Disposition
Link
AB-513 Pressure Equipment Repair and Alteration Requirements 4 1 2023-12-08 2028 Manager of Inspections IB23-048 Sep 1, 2027Jun 1, 2028
AB-521 Requirements for Engineered Pressure Enclosures 3 0 2024-10-10 2029 Design Survey Manager IB24-008 Sep 1, 2028Jun 1, 2029
AB-521a RRIMR Quality Plan Self-Evaluation and Application Form 0 0 2024-10-10 2029 Design Survey Manager N/A Sep 1, 2028Jun 1, 2029
AB-523 Procedure Guideline for the Replacement of Mechanically Assembled Piping Components 2 0 2022-10-31 2027 Manager of Inspections N/A Sep 1, 2026Jun 1, 2027
AB-536 Requirements for the Integrity Management of Grade 91 Steel Used Above Currently-Permitted Allowable Stresses 2 0 2022-04-28 2027 Assistant Chief Inspector, Technical Administration IB22-005 Sep 1, 2026Jun 1, 2027
Pressure Equipment Forms - 4. In-Service Inspection (AB-500 Series)
Form. No. Document Name Current Edition No. Current Revision No. Current Publication Date Next Scheduled Reaffirmation Responsible Position Enabling Information Bulletin Public
Consultation
Link
Public
Consultation
Disposition
Link
AB-505 Risk-Based Inspection Requirements for Pressure Equipment 4 0 2026-07-09 2031 Manager of Inspections IB26-002 --
AB-506 Inspection and Servicing Requirements for In-Service Pressure Equipment 4 0 2025-10-21 2030 Manager of Inspections IB25-019 Sep 1, 2029Jun 1, 2030
AB-507 Guidelines for the Inspection of Installed Fired Heaters 0 3 2019-07-12 None Manager of Inspections N/A
AB-512 Owner-User Pressure Equipment Integrity Management Requirements 4 0 2025-10-14 2030 Manager of Inspections IB25-015 Sep 1, 2029Jun 1, 2030
AB-512a Owner-User PEIM Program Scope and Responsibilities 0 0 2025-10-14 2030 Manager of Inspections N/A Sep 1, 2029Jun 1, 2030
AB-512b Integrity Management Requirements Checklist 0 0 2026-06-23 2031 Manager of Inspections N/A Sep 1, 2029Jun 1, 2030
AB-512c PEIM Audit Workbook 0 0 2025-10-14 2030 Manager of Inspections N/A Sep 1, 2029Jun 1, 2030
AB-512H Harmonized Requirements for Pressure Equipment Integrity Management Systems 1 1 2026-07-13 2027 Manager of Inspections IB26-004 Sep 1, 2026Jun 1, 2027
AB-513 Pressure Equipment Repair and Alteration Requirements 4 1 2023-12-08 2028 Manager of Inspections IB23-048 Sep 1, 2027Jun 1, 2028
AB-515 Quality Management System Requirements for Integrity Assessment Organizations 3 0 2022-09-19 2027 Manager of Inspections IB22-013 Sep 1, 2026Jun 1, 2027
AB-515a Integrity Assessment Organization Authorized Scope Form 0 0 2022-09-19 2027 Manager of Inspections N/A Sep 1, 2026Jun 1, 2027
AB-515b Integrity Assessment QMS Written Description Checklist 0 0 2026-06-23 2031 Manager of Inspections N/A Sep 1, 2026Jun 1, 2027
AB-519 Pressure Piping Alternative Test Methods Procedure Requirements 3 0 2024-07-10 2029 Manager of Inspections IB24-005 Sep 1, 2028Jun 1, 2029
AB-521 Requirements for Engineered Pressure Enclosures 3 0 2024-10-10 2029 Design Survey Manager IB24-008 Sep 1, 2028Jun 1, 2029
AB-521a RRIMR Quality Plan Self-Evaluation and Application Form 0 0 2024-10-10 2029 Design Survey Manager N/A Sep 1, 2028Jun 1, 2029
AB-522 Standard Pneumatic Test Procedure Requirements for Piping Systems 3 0 2023-04-18 2028 Manager of Design Survey IB23-016 Sep 1, 2027Jun 1, 2028
AB-532 Design Registration Requirements for Application Specific Pneumatic Test Procedures 2 0 2024-10-10 2029 Design Survey Manager IB24-010 Sep 1, 2028Jun 1, 2029
AB-538 Integrity Management Requirements For Mechanical Refrigeration Systems Containing Ammonia 2 0 2023-05-05 2028 Manager of Inspections IB23-020 Sep 1, 2027Jun 1, 2028
Examination & Certification- 1. Power Engineer Certification (AB-500 Series)
Form. No. Document Name Current Edition No. Current Revision No. Current Publication Date Next Scheduled Reaffirmation Responsible Position Enabling Information Bulletin Public
Consultation
Link
Public
Consultation
Disposition
Link
AB-528 Requirements for Reduced Supervision of Power Plants, Thermal Liquid Heating Systems and Heating Plants 4 1 2023-02 2027 VP Technical Services IB23-003 Sep 1, 2026Jun 1, 2027
AB-533 Power Engineering Course Acceptance Criteria 2 0 2020-01 2024 Manager of Examination & Certification IB19-015-R1 --
Examination & Certification - 3. In-Service Pressure Equipment Inspector Certification (AB-500 Series)
Form. No. Document Name Current Edition No. Current Revision No. Current Publication Date Next Scheduled Reaffirmation Responsible Position Enabling Information Bulletin Public
Consultation
Link
Public
Consultation
Disposition
Link
AB-526 In-Service Pressure Equipment Inspector Certification Requirements 3 3 2025-01-17 2029 Manager of Inspections IB25-001 Sep 1, 2028Jun 1, 2029
AB-527 Inspector Competence Management System Guidelines for In-Service Pressure Equipment Integrity Assessment Programs 3 0 2024-07-10 2029 Manager of Inspections N/A Sep 1, 2028Jun 1, 2029
Quality Management Systems(QMS) (AB-500 Series)
Form. No. Document Name Current Edition No. Current Revision No. Current Publication Date Next Scheduled Reaffirmation Responsible Position Enabling Information Bulletin Public
Consultation
Link
Public
Consultation
Disposition
Link
AB-512 Owner-User Pressure Equipment Integrity Management Requirements 4 0 2025-10-14 2030 Manager of Inspections IB25-015 Sep 1, 2029Jun 1, 2030
AB-512a Owner-User PEIM Program Scope and Responsibilities 0 0 2025-10-14 2030 Manager of Inspections N/A Sep 1, 2029Jun 1, 2030
AB-512b Integrity Management Requirements Checklist 0 0 2026-06-23 2031 Manager of Inspections N/A Sep 1, 2029Jun 1, 2030
AB-512c PEIM Audit Workbook 0 0 2025-10-14 2030 Manager of Inspections N/A Sep 1, 2029Jun 1, 2030
AB-512H Harmonized Requirements for Pressure Equipment Integrity Management Systems 1 1 2026-07-13 2027 Manager of Inspections IB26-004 Sep 1, 2026Jun 1, 2027
AB-515 Quality Management System Requirements for Integrity Assessment Organizations 3 0 2022-09-19 2027 Manager of Inspections IB22-013 Sep 1, 2026Jun 1, 2027
AB-515a Integrity Assessment Organization Authorized Scope Form 0 0 2022-09-19 2027 Manager of Inspections N/A Sep 1, 2026Jun 1, 2027
AB-515b Integrity Assessment QMS Written Description Checklist 0 0 2026-06-23 2031 Manager of Inspections N/A Sep 1, 2026Jun 1, 2027
AB-518 Pressure Piping Construction Requirements Document 9 0 2022-09-19 2027 Manager of Inspections IB22-014 Sep 1, 2026Jun 1, 2027
AB-518b Pressure Piping QMS Written Description Verification Checklist 0 0 2026-07-17 2031 Manager of Inspections N/A Sep 1, 2026Jun 1, 2027
AB-524 Pressure Relief Devices Requirements Document 8 0 2026-07-09 2031 Manager of Inspections IB26-001 --
AB-524b PRD QMS Written Description Certification Checklist 0 0 2026-06-23 2031 Manager of Inspections N/A --
AB-540 Quality Management System Requirements for Welder Performance Qualification Testing 1 2 2026-07-13 2027 Manager of Inspections IB26-005 Sep 1, 2026Jun 1, 2027
AB-540a WPQ Testing Scope and Responsibilities 1 0 2026-08-07 2027 Manager of Inspections N/A Sep 1, 2026Jun 1, 2027
AB-540b Welder Performance Qualification Testing Requirements QMS Manual Checklist 0 0 2026-06-23 2027 Manager of Inspections N/A Sep 1, 2026Jun 1, 2027
AB-541 Quality Management System Requirements for Pressure Fitting Construction 1 2 2026-07-13 2027 Manager of Inspections IB26-003 Sep 1, 2026Jun 1, 2027
AB-541a Pressure Fitting Construction Requirements QMS Manual & Audit Checklist 0 0 2026-06-23 2027 Manager of Inspections N/A Sep 1, 2026Jun 1, 2027
AB-541b Pressure Fitting Construction Requirements QMS Manual & Audit Checklist 0 0 2026-06-23 2027 Manager of Inspections N/A Sep 1, 2026Jun 1, 2027
Other Publications (AB-500 Series)
Form. No. Document Name Current Edition No. Current Revision No. Current Publication Date Next Scheduled Reaffirmation Responsible Position Enabling Information Bulletin Public
Consultation
Link
Public
Consultation
Disposition
Link
AB-508 Safety Codes Act Flow Chart 0 0 2025-10-21 2030 VP Technical Services N/A Sep 1, 2029Jun 1, 2030
AB-516 PESR User Guide 4 1 2025-01-15 2029 VP Technical Services N/A Sep 1, 2028Jun 1, 2029
AB-529 Pressure Equipment Exemption Order User Guide 5 0 2024-10-17 2029 VP Technical Services N/A Sep 1, 2028Jun 1, 2029
AB-534 Harmonized Requirements for Historical Boilers 3 0 2025-10-21 2030 Manager of Inspections IB25-018 Sep 1, 2029Jun 1, 2030

Last Modified: 7/3/2026 3:01:37 PM