2012 Fee Schedule
(2009 fee schedule remains in effect)
FEE SCHEDULE FOR DELEGATED FUNCTIONS
EFFECTIVE JANUARY 1, 2009
Being the fees and charges related to the powers, duties and functions
delegated
pursuant to the Boilers Delegated Administration Regulation (Alta. Reg. 32/2002)
and being set by the Alberta Boilers Safety Association
and being effective January 1, 2009
General
Schedule A Design Survey Fees
Schedule B Quality Programs
Schedule C Shop Inspection Fees
Schedule D Initial and Installation Inspection Fees
Schedule E Special Inspections
Schedule F Annual Registration Fees
Schedule G Engineers Fees
Schedule H Pressure Welders Fees
Schedule I In-Service Inspectors Fees
GENERAL
1 The fees payable under the Boilers Delegated Administration Regulation (AR
32/2002) are set out in Schedules A to I
2(1) Where the design of a boiler, pressure vessel or pressure piping system
is surveyed, the person submitting the design shall pay a fee to be known as a design
survey fee in accordance with Schedule A.
2(2) Where a welding, brazing or other joining procedure is surveyed, the person
submitting the welding, brazing or other joining procedure shall pay a fee to
be known as a joining procedure survey fee in accordance with Schedule A.
2(3) Where an application for the registration of a fitting is made the applicant
shall pay a fee to be known as a fitting registration fee in accordance with Schedule
A.
2(4) An applicant for a Quality Management System Certificate of Authorization
Permit shall pay the fees in accordance with Schedule B.
2(5) Where a boiler or pressure vessel is constructed in Alberta, the person
constructing it, upon completion of an inspection by a safety codes officer, shall
pay a shop inspection fee in accordance with Schedule C.
2(6) If a boiler or pressure vessel is constructed in Alberta the person installing
it, after a safety codes officer has completed the installation inspection, shall
pay an installation inspection fee in accordance with Schedule D.
2(7) Where a person imports a boiler or pressure vessel into Alberta, and it
is inspected by a safety codes officer, the person importing the pressure equipment
into Alberta shall pay an initial inspection fee in accordance with Schedule D.
2(8) A safety codes officer may direct that a fee, in accordance with Schedule
E, is payable by the owner or person in charge of the construction, installation,
modification, repair, testing, operation or use of a boiler, pressure vessel, power
plant, heating plant, pressure plant or safety valve servicing facility where:
|
(a) |
a safety codes officer is requested by an owner or person in charge to make an inspection
in an area which is not scheduled to be visited by the safety codes officer at that
time;
|
|
(b) |
a safety codes officer is requested by an owner to make an inspection outside the
safety codes officers normal working hours;
|
|
(c) |
a safety codes officer is requested by an owner to make an inspection of pressure
equipment not subject to the Act;
|
|
(d) |
a safety codes officer is requested by an owner to perform special services in relation
to repairs or servicing of pressure equipment;
|
|
(e) |
a safety codes officer is involved in any additional or exceptional work during an
inspection or series of inspections;
|
|
(f) |
a safety codes officer makes an inspection of new construction that is not covered
in Schedule C;
|
|
(g) |
a safety codes officer inspects a boiler or pressure vessel that is not subject to
the payment of an annual fee;
|
|
(h) |
A safety codes officer makes any inspection which, in his opinion, requires special
inspection fee to be paid.
|
2(9)
|
(a) |
Subject to subsections 2(10), 2(11) and 2(12), the owner or person in charge of a
boiler or pressure vessel which is in service or may be placed in service in Alberta
shall pay a fee to be known as an annual fee in respect of that boiler or pressure
vessel in accordance with Schedule F.
|
|
(b) |
The annual fee is payable each calendar year during which the boiler or pressure vessel
is in service at any time. The annual registration fee shall not be prorated; the
entire amount is payable unless the equipment meets conditions described in subsections
2(11) or 2(12) for the entire calendar year.
|
|
(c) |
The owner or person in charge of a boiler or pressure vessel subject to an annual
fee shall pay the annual fee in accordance with the terms stated on the invoice.
|
2(10) Deleted.
2(11) No annual fee is payable in respect of boilers and pressure vessels exempted
by the Administrator.
2(12) No annual fee is payable with respect to any boiler or pressure vessel
|
(a) |
that is not in service in Alberta, or
|
|
(b) |
that is not in service and
|
|
i) |
is not connected to a pressure piping system, or
|
|
ii) |
the valves connecting it to a pressure piping system are sealed closed, or
|
|
iii) |
is provided with a vent that is sealed open.
|
2(13)
|
(a) |
Where a boiler or pressure vessel that is not in use in the circumstances described
in subsection 2(12) is reconnected or used the owner or person in charge thereof shall
notify a safety codes officer in writing prior to its reconnection or use in Alberta.
|
|
(b) |
On the reconnection or use of a boiler or pressure vessel, the annual fee is payable.
|
2(14) An applicant for examination, certification, registration or any other
service under the Power Engineers Regulation (AR 85/2003) shall pay the applicable
fees in accordance with Schedule G.
2(15) An applicant for certification under the Pressure Welders Regulations
(AR 169/2002) shall pay the applicable fees in accordance with Schedule H.
2(16) An applicant for certification as an In-Service Inspector shall pay the
applicable fees in accordance with Schedule I.
3 Deleted
4 If, in a Schedule, a rate per hour is payable for an inspection, survey or
service, the fee payable is
|
(a) |
$136.00 for each hour and $68.00 for each additional half hour or portion of a half
hour, but not less than $136.00, and
|
|
(b) |
$204.00 for each hour and $102.00 for each additional half hour or portion of a half
hour if the inspection, survey or service is performed on a Saturday, Sunday or holiday,
but not less than $408.00.
|
5 Fees may be adjusted by ABSA's Board of Directors provided increases do not
exceed the increase in the Consumer Price Index (CPI) for the Province of Alberta
as published by Statistics Canada since the last fee increase. Fee increases above
the CPI ceiling would require the approval of the Minister.
SCHEDULE A
Design Survey Fees
1(1) The fees for the surveying of designs or procedures approved and registered,
are as follows:
|
(a) |
for a simple receiver, storage tank or similar pressure vessel,
|
|
|
(i) less than 3 m3 in volume will be $142.50;
|
|
|
(ii) exceeding 3 m3 but not exceeding 30 m3 in volume, $142.50
plus $24.50 for each additional 5 m3 or fraction of 5 m3 volume
over 3 m3;
|
|
|
(iii) exceeding 30 m3 in volume, $313.50 plus $24.50 for each additional
30 m3 or fraction of 30 m3 volume over 30 m3, to
a maximum of $418.00;
|
|
(b) |
for a firetube boiler, a TEMA Type BEU heat exchanger or a similar heat transfer unit:
|
|
|
(i) not exceeding 100 m2 of heating surface, $157.00 plus $33.00 for each
20 m2 or fraction of 20 m2 of heating surface;
|
|
|
(ii) exceeding 100 m2 of heating surface, $336.50 plus $33.00 for each
additional 100 m2 or fraction of 100 m2 of heating surface over
100 m2, to a maximum of $501.50;
|
|
(c) |
for a pressure vessel, heat exchanger or boiler of more complex design than those
referred to in clauses (a) and (b), the basic rate specified for the size of the unit
in clause (a) or (b) plus the hourly rate specified in section 4 of this Fee Schedule
for the time spent in surveying the details which add complexity;
|
|
(d) |
for
|
|
|
(i) a pressure piping system design,
|
|
|
(ii) a repair, alteration, test or other procedure, except a welding or brazing procedure,
or
|
|
|
(iii) a boiler, pressure vessel or heat exchanger that, due to its characteristics,
cannot be readily classified under clause (a) or (b),
|
|
|
the hourly rate specified in section 4 of this Fee Schedule;
|
|
(e) |
for a welding, brazing, or other joining procedure, $136.00.
|
|
|
|
(2) Notwithstanding Section 4 of this Fee Schedule, if a client requests a
design survey or a procedure survey to be undertaken within two weeks or less,
such survey will be carried out on a priority basis and the fees payable shall be
as follows:
|
|
(i) for designs or procedures of a type covered by subsection (1)(a) or (1)(b), the
fee specified in subsection (1)(a) or (1)(b), plus 30%, subject to a minimum fee of
$408.00; or
|
|
|
(ii) for designs or procedures of a type covered by subsections (1)(c) or (1)(d),
$204.00 per hour expended, subject to a minimum fee of $408.00;
|
|
|
|
(3) Where designs or procedures that are approved and registered are revised,
a safety codes officer may direct that a fee shall be paid for each revision, subject
to a minimum fee of $115.00.
(4) For certification of additional prints or documents or for the provision
of prints of documents, a fee of $10.50 for each print, sheet or document may be charged.
(5) The fee for document searches, with or without the supplying of copies
of the documents searched for, is the hourly rate specified in section 4 of this Fee
Schedule, subject to a minimum fee of $115.00.
(6) When a design or procedure is submitted for approval and is reviewed but
is not approved, a safety codes officer may direct that a fee shall be paid for the
time expended on the review, at the hourly rate specified in Section 4 of this Fee
Schedule except that the minimum time that may be charged is one half hour.
(7) The fee for any other service relating to the surveying of designs or procedures,
is the hourly rate specified in section 4 of this Fee Schedule.
Fitting Registration Fee
2(1) The fees for the registration of fittings or the revision or updating
of a fitting registration are as follows:
|
(a) |
for each size, type and pressure registered, $136.00;
|
|
(b) |
for collective registration as provided in section 20(2) of the Pressure Equipment
Safety Regulation (AR 49/2006), the hourly rate specified in section 4 of this Fee
Schedule except that a minimum of 2 hours shall be charged;
|
(2) Notwithstanding subsection (1)(a), if a single fitting is of complex design,
a safety codes officer may direct that the hourly rate specified in section 4 of this
Fee Schedule be charged.
SCHEDULE B
Quality Management System Fees
1(1) The fee for application for a quality management system certificate of
authorization permit is $1,045 which shall be non-refundable.
(2) The fee for the review of a quality management system is the hourly rate
specified in section 4 of this Fee Schedule, except that a minimum of 4 hours shall
be charged.
(3) The fee for the issuance of a certificate of authorization permit is $136.00.
(4) The fee for the reissuance of a certificate of authorization permit because
of a change of name of the certificate holder to whom the certificate was originally
issued is $136.00.
(5) If the location of the facility is changed from that shown on the certificate
of authorization permit, an implementation review shall be conducted, and the applicable
fees are those set out in subsections (2) and (3).
(6) The audit fee for certificate of authorization permit holders
shall be the hourly rate specified in section 4 of this Fee Schedule, except that
a minimum of 4 hours shall be charged.
SCHEDULE C
Shop Inspection Fees
1 The fees for shop inspections are $136.00 for each shop visit plus
|
(a) |
for boilers exceeding a volume of 85 litres intended to form part of a power plant,
$315.50 plus $25.50 for each 50 m2 or fraction of 50 m2 of heating
surface;
|
|
(b) |
for boilers exceeding a volume of 85 litres intended to form part of a heating plant,
50% of the fees payable under clause (a);
|
|
(c) |
for boilers having a volume not exceeding 85 litres intended to form part of a power
plant or heating plant, $111.00;
|
|
(d) |
for pressure vessels other than shell and tube heat exchangers
|
|
|
(i) not exceeding 3 m3 in volume, $104.50 plus $20.00 for each 1 m3 or
fraction of 1 m3 in volume;
|
|
|
(ii) exceeding 3 m3 but not exceeding 30 m3 in volume, $173.50
plus $55.50 for each additional 5 m3 or fraction of 5 m3 over
3 m3;
|
|
|
(iii) exceeding 30 m3 in volume, $523.50 plus $55.50 for each additional
30 m3 or fraction of 30 m3 over 30 m3 to a maximum
of $3,740.00;
|
|
(e) |
for heat exchangers of the shell and tube type and thermal liquid heaters, if the
surface of the heat exchanger or heater
|
|
|
(i) does not exceed 100 m2, $142.00 plus $33.00 for each 20 m2 or
fraction of 20 m2 of heating surface, or
|
|
|
(ii) exceeds 100 m2, $306.00 plus $30.00 for each additional 100 m2 or
fraction of 100 m2 of heating surface over 100 m2.
|
2 If pressure vessels of the same design, ready for hydrostatic testing, are
inspected at the same time, the shop inspection fee is
|
(a) |
for 6 to 11 pressure vessels inspected at the same time, 75%, and
|
|
(b) |
for 12 or more pressure vessels inspected at the same time, 50%
|
of the fees payable under section 1(d).
SCHEDULE D
Initial and Installation Inspection Fees
1 The fee payable for initial and installation inspections is the hourly rate
specified in section 4 of this Fee Schedule except the minimum time charged shall
be one hour.
SCHEDULE E
Special Inspection Fees
1 The fee payable for a special inspection is the hourly rate specified in
section 4 of this Fee Schedule.
2 The owner or operator shall also pay the cost of the safety codes officer's
travelling and subsistence expenses incurred in conducting the inspection at the current
rate provided in the ABSA policy manual.
SCHEDULE F
Annual Fees
1 Annual registration fees for non-process equipment are as follows:
|
(a) |
for boilers exceeding a volume of 85 litres that form part of a power plant and for
thermal liquid heaters that
|
|
|
(i) do not exceed 100 m2 of heating surface, $194.50 |
|
|
(ii) exceed 100 m2 of heating surface but do not exceed 600 m2,
$224.75, or
|
|
|
(iii) exceed 600 m2 of heating surface, $268.50
|
|
|
|
|
(b) |
for boilers exceeding a volume of 85 litres that form part of a heating plant that
|
|
|
(i) do not exceed 60 m2 of heating surface, $68.00
|
|
|
(ii) exceed 60 m2 of heating surface but do not exceed 100 m2 of
heating surface, $97.25 or
|
|
|
(iii) exceed 100 m2 of heating surface, $135.75 |
|
(c) |
for pressure vessels, other than shell and tube type heat exchangers, that
|
|
|
(i) do not exceed 10 m3 in volume, $45.00 or
|
|
|
(ii) exceed 10 m3 in volume, $59.50.
|
|
(d) |
for heat exchangers of the shell and tube type that
|
|
|
(i) do not exceed 40 m2 of heating surface, $45.00 or
|
|
|
(ii) exceed 40 m2 of heating surface, $59.50.
|
|
(e) |
for electric boilers exceeding a volume of 85 litres, that
|
|
|
(i) do not exceed 10 m3 in volume, $90.00
|
|
|
(ii) exceed 10 m3 in volume, $120.25.
|
|
|
|
4 Annual registration fees for equipment in process facilities is as follows:
|
(a) |
for boilers exceeding a volume of 85 litres that form part of a power plant and for
thermal liquid heaters that
|
|
|
(i) do not exceed 500 m2 of heating surface, $132.75 or
|
|
|
(ii) exceed 500 m2 of heating surface, $212.25.
|
|
(b) |
for boilers exceeding a volume of 85 litres that form part of a heating plant that
|
|
|
(i) do not exceed 100 m2 of heating surface, $48.00 or
|
|
|
(ii) exceed 100 m2 of heating surface, $58.50. |
|
(c) |
for pressure vessels, other than shell and tube type heat exchangers, that
|
|
|
(i) do not exceed 30 m3 in volume,$48.00 or
|
|
|
(ii) exceed 30 m3 in volume, $58.50.
|
|
(d) |
for heat exchangers of the shell and tube type that
|
|
|
(i) do not exceed 100 m2 of heating surface, $48.00 or
|
|
|
(ii) exceed 100 m2 of heating surface, $58.50.
|
|
(e) |
for electric boilers exceeding a volume of 85 litres, that
|
|
|
(i) do not exceed 10 m3 in volume, $48.00
|
|
|
(ii) exceed 10 m3 in volume, $58.50.
|
5 The fee for all inspection activities for process facilities is the hourly
rate specified in section 4 of this Fee Schedule.
SCHEDULE G
Power Engineers Certification Fees
1 The fee payable for the issuance of a certificate of competency to a person
in consideration of an equivalent Certificate of Competency from a jurisdiction outside
Alberta is $157.00.
2 The annual fee for the registration of a Certificate of Competency is $31.50.
3 The fees payable for the issuance of a temporary Certificate of Competency
is $157.00.
4 The fee payable for a duplicate Certificate of Competency is $57.50.
5 The fee payable for application and writing an examination is $94.00.
6(1) If a safety codes officer is requested to conduct an examination in a
place where engineers are not normally examined, the safety codes officer may direct
the person requesting the examination to pay a special examination fee under this
section.
(2) The fee payable for a special examination is the hourly rate specified
in section 4 of this Fee Schedule.
(3) The person requesting the examination shall also pay the cost of the officer's
travelling and subsistence expenses incurred in conducting the special examination
at the current rate provided in the ABSA policy manual.
SCHEDULE H
Pressure Welders Certification Fees
1 The following fees are payable for the matters specified:
|
(a) |
Grade B Pressure Welder Certificate of Competency |
|
|
|
Performance Qualification Application and Test
|
$172.00 |
|
|
Facility and coupon fee
|
$63.00 |
|
(b) |
Grade C Pressure Welder's Certificate of Competency |
|
|
|
Performance Qualification Application and Test
|
$235.00 |
|
(c) |
Machine Welding Operator's Certificate of Competency |
|
|
|
Performance Qualification Application and Test
|
$235.00 |
|
(d) |
Duplicate Pressure Welder's Certificate of Competency
|
$57.50 |
|
(e) |
Duplicate Performance Qualification Card
|
$34.50 |
2(1) A safety codes officer may direct that a fee is payable under this section
by a pressure welder or his employer if the officer conducts a pressure welder's examination
or performance qualification test in a place in which pressure welders are not normally
examined or tested.
(2) If a safety codes officer directs the payment of a special examination
fee,
|
(a) |
the amount of the fee is the hourly rate specified in section 4 of this Fee Schedule,
and
|
|
(b) |
the welder or the employer shall also pay the cost of the safety codes officer's travelling
and subsistence expenses, incurred in conducting the examination or test, at the current
rate provided in the ABSA policy manual.
|
3(1) The fee payable for the application, registration and certification of
a Welding Examiner Certificate of Competency without examination is $115.00.
(2) The fee for the renewal of a Welding Examiner Certificate of Competency
is $115.00.
(3) The examination fee for each examination leading towards a Welding Examiner
Certificate of Competency is $115.00.
(4) The fee payable for a duplicate Welding Examiner Certificate of Competency
is $57.50.
SCHEDULE I
In-Service Inspector Certification Fees
1 The application and certification fee for an In-Service Inspectors Certificate
of Competency is $157.00.
2 The fee for the examination on pressure equipment safety legislation leading
to an In-Service Inspectors Certificate of Competency is $94.00.
3 The fee for the renewal for an In-Service Inspectors Certificate of Competency
is $157.00 for a period of 5 years.
4 The fee for a duplicate In-Service Inspector Certificate of Competency is
$57.50.